Around Hitchin our liquid screed is pumped into kitchen extensions, knocked-through ground floors and flats, and the level, close-packed surface it leaves can be walked on 24 to 48 hours later. With so many post-war semis in the town, many new extension floors must finish flush with the old house, and a self-levelling screed makes a precise finished height easier to hit. We pump both kinds: one with a calcium sulphate binder, one based on cement.

Where pumped liquid screed fits Hitchin homes

Big open rooms are where a pumped floor earns its keep. Out of the hose it spreads round pipes and into corners and settles flat by itself, so an entire kitchen extension is done in one visit and needs a fraction of the joints that hand-laid screed would.

That suits a common Hitchin project: a rear extension on a post-war semi, opening into the existing kitchen. The new floor must end up at exactly the height of the old kitchen, and pouring a self-levelling screed to a set mark makes that join easier to hit. Where the old floor is slightly out, a thin levelling coat afterwards blends the two surfaces.

Newer housing suits it as well. Since 2000, 16% of the town's homes have gone up, and plots of that age are often planned around a flowing screed from day one.

Flats matter too. Blocks built as flats from the outset hold 24% of homes, and on upper floors pumping removes the need to carry materials through the building. Several flats can be poured one after another in a day, which keeps a refurbishment programme moving.

It can also go down thinner: floating over insulation, liquid screed starts at around 35mm in a house and 40mm on a commercial floor. Flatness to SR1 or SR2, meaning a 3mm or 5mm gap at most beneath a 2m straightedge, is well within its reach. For more on pipe cover, see screed over underfloor heating in Hitchin.

Getting the pump to a Walsworth or Westmill room

A pumped pour starts at the kerb. The hose has to reach the room from wherever the lorry and pump can park, and we cover the route through the hall or up the stairs before pouring. Driveways make this easy. Narrow side passages, a long run through a terrace or a flat several floors up need more planning, and the centre has Tuesday and Saturday markets to work around.

Walsworth, Westmill, Purwell, Sunnyside or anywhere else in town, the first thing to send us is a note on parking and how we get in. Our screed pumping service explains how hoses are routed and how long a run can be.

Being able to cross the room after a day or two does not make the floor dry. Through the first 40mm the floor loses moisture at roughly a millimetre a day, and it slows down after that. For airing the room and testing for moisture, read our guide to screed drying times. In the first few days, keep windows slightly open and doors closed to the rest of the house, and avoid heaters blowing directly onto the surface.

The same service runs in neighbouring towns, including liquid screed in Letchworth.

Liquid Screed prices in Hitchin

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Hitchin

Smooth liquid screed finish in a narrow room
Smooth liquid screed finish in a narrow room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Hitchin

On the map, Hitchin sits north-north-east of Slough, about 32.8 miles from our base in a straight line (postcodes including SG5 and SG4), next to Letchworth (2.9 miles), Stevenage (4.7 miles), Baldock (4.8 miles) and Stotfold (5 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Hitchin: your questions

Is liquid screed good for a kitchen extension on a Hitchin semi?

Usually, yes. It covers a wide, open floor in one visit, flows around heating pipes with no voids and reaches SR1 or SR2 flatness without heavy preparation. On a very small extension with awkward access, sand and cement may cost less. Once we have seen your plans, we will say which one we would use.

Can liquid screed and sand and cement be used in the same Hitchin house?

Yes, and it is common on a renovation. A large open-plan extension may be poured in liquid screed, while a wet room laid to falls, or a small room with difficult access, is done by hand in sand and cement. We plan the depths so both finish at the right levels.

How long before flooring can go down on liquid screed?

Longer than the 24 to 48 hours before it can be walked on. Up to 40mm thick, think of it as a millimetre a day; deeper than that takes longer, and a moisture test should come before any covering. Good ventilation in the first weeks helps; heaters blowing straight at the surface do not.