info@kandbscreeding.co.uk

Floor Levelling · Wiltshire

Floor Levelling and Self Levelling Screed in Salisbury

Self levelling compound is how we get Salisbury floors flat for engineered wood, LVT, large tiles and vinyl. Much of this work is in the city centre. Many central flats want a thin levelling coat or an acoustic floor build-up rather than a fresh screed, and retail units in The Maltings and Old George Mall need levelling and screed repairs whenever shops change hands.

Levelling city centre flats and Salisbury homes

Any flaw in the base comes through a thin finish. Sheet vinyl and LVT show ridges, and large tiles rock or crack on an uneven floor. In a flat, the base is often an old screed or slab with patches, leftover adhesive and uneven joins, and a thin coat is needed to bring it flat.

BS 8204 uses a 2m straightedge to measure flatness. The tolerance under it is 3mm at SR1, 5mm at SR2 and 10mm at SR3. Many thin sheet finishes insist on SR1, so a floor that is fine under carpet can still fail for vinyl.

Most compound work falls in the 2mm to 10mm range, though some products go deeper. The base is cleaned first, then primed to suit what it is: concrete, sand and cement, calcium sulphate or an existing floor.

Flats in the city centre may also need an acoustic floor build-up so footsteps are not heard below. That build-up and the levelling coat have to be designed together so the finished floor lands at the right height.

In houses, the join between an older floor and an extension is the usual trouble. Homes from 1973 to 1999 are 22% of Salisbury's stock, and any house that has been extended may have a slight step or slope at the join. A thin coat over both removes it.

Where it would take more than about 10mm to flatten a floor, or the floor is cracked and loose, it needs a new screed; thick compound tends to crack and lose its bond. That route starts on the liquid screed page for Salisbury.

Shop refits at The Maltings and Old George Mall

Each time a shop in The Maltings or Old George Mall changes hands, the old covering is lifted and leaves adhesive, patches and damaged screed. The incoming tenant wants a base that is flat and sound for their flooring, usually against a tight deadline.

The order of work runs preparation, repair, primer, then compound. Old adhesive and weak material come off, sometimes by grinding, which falls under our floor preparation work. Damaged patches of screed are cut out and made good, then the floor is primed and levelled. Quick drying compound means the fitters are not left waiting long for the flooring stage.

Offices and units on the small business park along the north edge of Old Sarum Airfield get the same treatment when they are refitted. If a floor there is badly damaged and not simply uneven, repairing the screed has to come before any levelling.

Shop fitters should give us the opening date when they ask for a price. We plan back from it, allowing for strip-out, repairs, priming, compound and drying, so the flooring contractor arrives to a ready floor. We also level shop and office floors in nearby Andover.

How we price floor levelling in Salisbury

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Salisbury

Finished floor screed in a large loft space
Finished floor screed in a large loft space.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Salisbury

On the map, Salisbury sits west-south-west of Slough, about 59.2 miles from our base in a straight line (postcodes including SP1, SP2 and SP5), next to Amesbury (7 miles), Tidworth (13.1 miles), Verwood (13.5 miles) and Romsey (14.1 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Salisbury: your questions

Can a shop floor in Salisbury be levelled overnight?

Often the compound can go down outside trading hours, and fast drying products keep the wait short. How long it takes comes down to which product is used, how deep it goes and how warm the unit is. We confirm the drying time before starting so the fit-out can be planned around it, and the flooring team knows when to arrive.

What is an acoustic floor build-up in a flat?

It is a layer, or set of layers, laid under the floor finish to reduce impact noise passing to the flat below. In older buildings, the lease may require one. It has to be matched with the levelling coat and floor finish so the result is flat and at the right height at the door.

Is floor levelling cheaper than a new screed?

Usually, yes, because compound goes down thin and quickly over a sound base. But it only works if the floor beneath is solid and needs no more than about 10mm in most places. A cracked or loose screed has to be repaired or replaced first, and compound over it would only fail later.

Nearby

Floor Levelling near Salisbury

Free, no-obligation quote

A fixed price for your Salisbury floor