info@kandbscreeding.co.uk

Liquid Screed · Lincolnshire

Liquid Screed in Stamford

Liquid screed is pumped in from a mixer lorry and levels itself, giving Stamford extensions, kitchens and flats a flat, dense floor in a single visit. The town's building record shapes where it fits: only 8% of Stamford's homes were built in 2015 or later, so in Stamford a liquid floor is more likely to go into an extension on an existing house than a whole new-build ground floor. You can walk across it carefully after 24 to 48 hours.

Stamford rooms where a pumped screed pays off

The case for liquid screed is size and speed. A pump can place a large open floor in hours, the material flows into corners and around obstructions, and it sets with low shrinkage and far fewer joints than a hand-laid floor. It reaches SR1 or SR2 flatness without much trouble, and that is the base LVT, big tiles and engineered boards ask for. That makes it a strong fit for a kitchen and family room extension on one of Stamford's post-war or 1970s to 1990s semis, where the new floor is often one continuous space. It is less suited to a single small room, where the cost of the lorry and pump outweighs the saving in labour. Upstairs flats suit it too. Around 12% of Stamford homes are flats, and for an upper-floor flat a pump line up the stairwell avoids carrying tonnes of sand and cement by hand. On the new housing planned for Stamford North and Stamford East, flowing screed is expected to be the normal ground floor finish. Floating on insulation, a house floor in liquid screed starts at around 35mm, and a commercial one at 40mm. Both calcium sulphate and cement based liquid screeds exist, and the right one depends on whether the room could get wet, the programme and the finish. For the full comparison, read liquid versus sand and cement.

Pump access in Stamford streets

Everything about a liquid pour depends on getting the hose to the room. The lorry and pump pull up as near the door as Stamford's streets allow, and the hose is run through the hall, over a side gate or up the stairs. In a street where parking is tight, we may ask about a suspension or plan an early start before cars fill the kerb. A listed or conservation area building is a separate case, because its floor build-up is agreed with the owner and the conservation officer before any screed is chosen. Where the lorry simply cannot park close, our screed pumping service page explains how the hose is run to the room. Inside, the room needs preparing before pour day. Insulation and edge strip go down first, then a membrane with taped joints so the liquid cannot escape underneath. You can step on it after 24 to 48 hours, though it is slower to dry for flooring, at about 1 day per mm up to 40mm. For heated floors, the screed over underfloor heating in Stamford page covers pipe cover and warm-up.

Liquid Screed prices in Stamford

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Stamford

Finished floor screed in a residential extension
Finished floor screed in a residential extension.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Stamford

Stamford is about 77.7 miles north of our Slough base as the crow flies, with postcodes including PE9. The nearest towns to it are Oakham (10.5 miles), Peterborough (11.4 miles), Corby (14.7 miles) and Whittlesey (16.3 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Stamford: your questions

How thick does liquid screed need to be in a Stamford extension?

Floating over insulation in a house, from about 35mm. Where heating pipes run beneath, they need 25mm or more of cover, which brings the floor to about 45 to 50mm overall. It also has to finish flush with the floor you already have, so we measure both before we quote.

Can liquid screed be pumped to an upper-floor flat?

Yes, in most cases. From the pump at the kerb, the hose goes up the stairwell or in through a window to reach the room. The floor below must be able to take the load, and the membrane and edge strip must be sealed so nothing leaks through. We check access and the route before confirming the date.

Is liquid screed more expensive than traditional screed?

Usually, by the square metre: the national 2026 figures are £24 to £31 per m² for liquid and £18 to £25 for sand and cement. Across a big open kitchen extension, the time saved by pumping can narrow the difference. In a box room, a hand-laid floor tends to work out cheaper in total.

Nearby

Liquid Screed near Stamford

Free, no-obligation quote

A fixed price for your Stamford floor