Underfloor Heating Screed in Tewkesbury

Where a Tewkesbury floor has wet heating pipes in it, K & B covers them with pumped liquid screed or with sand and cement laid by hand, at the correct depth and with a careful first warm-up. A large share of the town was built between the 1970s and the 1990s, and those houses suit heated extensions and heating retrofits. Pipework is down to your heating engineer; our screed goes over their layout.

Heated floors in Tewkesbury's later twentieth century houses

Some 30% of Tewkesbury's homes date from 1973 to 1999. Houses of that age are often being extended at the back or opened up into a kitchen and family room, and underfloor heating is the natural choice for a wide floor with glazing along one side.

The screed does most of the work in a wet system. Every pipe has to be fully wrapped, with no voids, so the warmth spreads evenly. That is why pumped liquid screed in Tewkesbury is normally used, as it runs in around each pipe. Allow 25mm or more over the pipework, which puts the floor at roughly 45 to 50mm overall. Mixed and laid by hand, a cement floor wants about 45mm on top of the pipework, so it ends up thicker.

Retrofits are harder. In an existing room the floor height is often fixed by the doors, the stairs and the kitchen, so there may not be space for insulation, pipes and a full screed. A thinner liquid section often fits where cement would not, and we measure the layers before we quote. Our screed thickness guide adds them up for you.

On a flood-aware ground floor, cement based screed over the pipes may be preferred. We will discuss that with you and the heating engineer before the pour, so the choice of screed, the depth and the heat-up plan are settled in advance.

Commissioning a new heated floor in Tewkesbury

Most heated floor problems start with the first warm-up. A screed that is heated too hard, too soon can crack or curl. The safe approach is to wait, then bring the temperature up slowly.

With a calcium sulphate pour, the heating can normally go on at about 7 days; a sand and cement floor should be left at least 21 days before it is warmed. After that the heat is raised step by step, held, and later lowered, to the schedule set by the screed manufacturer and your heating engineer. We hand over that guidance in writing.

By the time we pour, the pipes should be down, clipped and pressure tested, sitting on insulation with the edge strip fitted. If you want those layers supplied or looked over, our insulation and membrane layers service covers it. Tell us the pipe spacing and the depth of the insulation when you ask for a price, because both affect how much screed the floor needs and how long it will take to dry.

For a flowing screed poured over pipes, published UK rates for 2026 run between £20 and £35 a square metre. For the same service in Evesham, see our underfloor heating screed in Evesham page.

Underfloor Heating Screed prices in Tewkesbury

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Tewkesbury

Long run of underfloor heating pipes ready for screed
Long run of underfloor heating pipes ready for screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Tewkesbury

On the map, Tewkesbury sits west-north-west of Slough, about 72.3 miles from our base in a straight line (postcodes including GL20), next to Cheltenham (7.2 miles), Gloucester (9.6 miles), Evesham (11.3 miles) and Stroud (17.3 miles).

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Tewkesbury: your questions

Can screed go straight over underfloor heating pipes?

Yes, a wet system is designed for exactly that. The pipes are fixed over insulation, then screed goes on top and buries them completely. Cover needs to be 25mm or more for liquid screed and about 45mm for a hand-laid one. The pipes must be pressure tested before we lay the screed.

When can the heating be switched on in a new Tewkesbury extension?

Calcium sulphate is ready for gentle heat at about 7 days; sand and cement not before 21 days. Bring the temperature up gently, one small step at a time. Turning the thermostat straight up to maximum risks cracking the fresh screed. You get the warm-up schedule in writing at handover.

Does K & B install the underfloor heating pipes as well?

No. We do the screed only. The pipes are put in and checked under pressure by whoever fits your heating, and after that we lay screed over them at the depth they need. We can also provide or inspect the layers underneath, from insulation to edge strip, so everything is ready for the pour.