info@kandbscreeding.co.uk

Underfloor Heating Screed · Northamptonshire

Underfloor Heating Screed in Wellingborough

We lay screed over wet underfloor heating in Wellingborough homes, with full pipe encapsulation, the correct cover and clear guidance on the first heat-up. The pipes are fitted by your heating engineer, and the screed over them is down to us. Houses here split between very new and much older: 10% of homes date from 2015 or later, and most new houses at Stanton Cross and Glenvale Park come with heating pipes under a flowing screed. In an older terrace, a retrofit is limited by floor height.

Pipe cover and depth in Wellingborough heated floors

Heat from the pipes travels out through the screed, which is why the cover above them is the figure to get right. With liquid screed that cover is 25mm minimum, so the layer normally ends up 45 to 50mm deep overall. Sand and cement asks for about 45mm of cover, which makes the finished floor noticeably thicker.

In a retrofit, that difference counts for a lot. In an older terrace near the centre, where the existing floor is dug out and rebuilt, every millimetre of height counts against the doorways and the bottom step of the stairs. A thinner pumped screed often makes heating possible without raising the floor. In a new house at Stanton Cross or Glenvale Park, the depth is normally set on the drawings and we pour to that figure.

Full encapsulation is the second requirement. Air pockets around pipes leave cold spots and weak areas. A flowing screed moves around every pipe on its own, while a hand-laid screed has to be worked in carefully around the loops.

Underneath, the build-up must be right: rigid insulation, a membrane with taped joints, and an edge strip around every wall so the heated screed can expand. We check or supply these through our insulation and membranes service. For a closer look at the pumped option, see liquid screed in Wellingborough. Fitting the pipes themselves is not something we do.

First heat-up after a Queensway or Kingsway extension

Owners on the overspill estates regularly add extensions, and when the new room includes a wet heating system, the screed goes in over the pipes before anything else. After the pour, though, nobody should touch the thermostat for a while.

With calcium sulphate the heating can normally come on from about day 7; with sand and cement, wait 21 days at the least. In both cases the start is gradual: the water temperature begins low and rises in small steps over a period of days, following the commissioning schedule your heating engineer and the screed supplier provide. Turn it straight up to full and the screed can crack and curl.

Warming the floor this way also helps it dry, but it does not replace testing. A hygrometer test still comes before any tiles, LVT or wood boards go down, and the floor only passes once the reading sits inside the limit the flooring manufacturer sets. How the depth of the screed changes that wait is covered in how long screed takes to dry.

Tiles and thin floors also need a flat base. If a heated screed is slightly out, a thin coat of compound can bring it to SR1 or SR2 before the flooring, as described under floor levelling in Wellingborough.

Underfloor Heating Screed prices in Wellingborough

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Wellingborough

Underfloor heating pipework running between two rooms before screeding
Underfloor heating pipework running between two rooms before screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Wellingborough

As the crow flies, our yard in Slough is about 53.3 miles from Wellingborough, which lies to the north. Postcodes here include NN8, and Rushden (4.1 miles), Burton Latimer (4.2 miles), Kettering (6.9 miles) and Raunds (7.3 miles) are close by.

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Wellingborough: your questions

Can underfloor heating go into an old Wellingborough terrace without raising the floor much?

Often, yes. When the old solid floor is dug out, there is room to fit insulation, pipes and a thin liquid screed with at least 25mm over the pipes, keeping the finished level close to the original. We measure door thresholds and the first stair before recommending a depth.

When can I turn the underfloor heating on after screeding?

For calcium sulphate, usually from around day 7; for sand and cement, no sooner than 21 days. Begin with the water cool and step it up over several days as the commissioning schedule sets out. The heating helps the screed dry but it should never be turned straight up to full.

Do you fit the underfloor heating pipes as well as the screed?

No, that part belongs to your heating engineer. They lay the pipes and pressure test them, then we put the screed down so every pipe is fully encased at the right cover. Before that we can look over the insulation board, the membrane and the edge strip, or supply them ourselves.

Free, no-obligation quote

A fixed price for your Wellingborough floor