Liquid Screed · East Sussex

Liquid Screed in Eastbourne

We pump and lay liquid screed across Eastbourne for kitchen extensions, open-plan ground floors and flats on upper storeys. Access decides a lot of this. The screed is mixed in a truck, pumped through a hose to the room and left to find its own level, so the job depends on where the pump can stand. In a town where many homes are terraced houses or flats above street level, that is the first thing to work out.

Where pumped screed fits in Hampden Park and Langney

Semis and terraces in Hampden Park and Langney tend to gain kitchen extensions, and an extension floor is where liquid screed makes most sense. The room is usually open, the area is larger than a single original room, and the owner wants to walk on it quickly. One visit is normally enough to pour a floor like that, and people can walk across it after 24 to 48 hours.

Depth depends on what is underneath. On insulation with no pipes, a house floor in liquid screed begins at roughly 35mm. Where heating pipes run through it, they need 25mm or more of screed above them, so the whole layer usually comes to 45 to 50mm. Since the screed finds its own level, an SR1 or SR2 finish is well within reach, and that suits most tiles, LVT and engineered wood.

There are two broad families of liquid screed. Calcium sulphate types are for rooms that stay dry, while a utility or shower area that could get wet calls for a cement based flowing mix. The choice follows the room, and the detail of the calcium sulphate grades sits on our anhydrite flow screed page for Eastbourne.

Roughly 27% of the town's housing went up between 1973 and 1999. Many houses from those decades sit on a solid ground floor, and an extension has to finish flush with it. Still deciding between the two main types? The liquid versus sand and cement comparison lays out what each one does better.

Getting the hose into an Eastbourne terrace or flat

About 24% of homes in the town are terraced, and a terrace usually means no driveway and a front door straight onto the pavement. That is workable. The pump stands in the road and the hose runs through the house to the back, so we need to know about parking bays, permits and whether a neighbour's car will be in the way on the day.

Flats above the ground floor are pumped the same way, with the hose run up the stair or, where the building allows, through a window. Tell us the floor, the width of the stairwell and whether there is a lift, and we will plan the route before quoting.

Then comes drying. Allow roughly a day for each millimetre up to 40mm, and longer per millimetre beyond that. A floor you can walk on after two days may need weeks more before moisture sensitive flooring is laid. The screed drying times guide helps you plan the other trades around it. We also pump liquid screed in nearby Polegate.

Liquid Screed prices in Eastbourne

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Eastbourne

Floor screed with movement joints cut between bays
Floor screed with movement joints cut between bays.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Eastbourne

On the map, Eastbourne sits south-east of Slough, about 66.4 miles from our base in a straight line (postcodes including BN21, BN20, BN23 and BN22), next to Polegate (4.1 miles), Hailsham (6.8 miles), Seaford (7.8 miles) and Bexhill-on-Sea (9.9 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Eastbourne: your questions

How thick does liquid screed need to be in an Eastbourne extension?

On insulation with no heating, an Eastbourne extension in liquid screed usually starts at around 35mm. With wet underfloor heating, the pipes want 25mm or more above them, which puts the total at 45 to 50mm in most cases. The final depth also depends on the height of the existing floor it has to meet, which we measure before quoting.

Can liquid screed be pumped up to a second floor flat?

Yes, provided there is a safe route for the hose from the road to the room. It can run up a communal stair or, in some buildings, through a window. We check the route, the parking and any building rules with you first, so the pour goes to plan on the day.

When can I walk on a new liquid screed floor?

You can tread on it lightly once 24 to 48 hours have passed. Being able to walk on it does not mean it is ready for flooring, though. Tiles, LVT and wood need the screed to dry further, which takes longer on deeper floors, and the moisture is tested before any finish goes down.