Underfloor Heating Screed · Surrey

Underfloor Heating Screed in Frimley

We screed over wet underfloor heating in Frimley kitchen extensions and knock-throughs, using liquid or sand and cement to suit the system. Floors in houses from the 1950s to the 1990s often have little or no insulation, so an extension is a good moment to add insulation boards and a membrane and run heating across the whole open-plan room. The pipes are fitted by others, and we lay the screed on top.

Heating a whole open-plan room in Frimley

A further 36% of Frimley's housing dates from 1973 to 1999, and houses of that age are typically extended or knocked through to make one big kitchen and family room. When the old kitchen floor is dug up at the same time, the heating can run across the whole space, not just the new part.

That makes the build-up a question of height. Insulation boards, a damp membrane, pipework and screed all have to fit under a finished surface that lines up with the hall and the rooms beyond. Pumped screed must clear the pipes by 25mm or more, normally 45 to 50mm overall, whereas a hand-laid mix wants about 45mm above them and comes out deeper. Where the old slab cannot be lowered, the thinner liquid build-up can leave room for more insulation.

The screed must fully encapsulate the pipes. Air pockets slow heat transfer and leave weak points above the pipes. A flowing screed surrounds them naturally; sand and cement is packed around each run by hand.

Before the pour, the pipes should be filled and pressure tested so any leak shows while they can still be reached. Edge strip goes round every wall to allow the floor to move as it heats. If the insulation and membrane are not already in, we can supply and fit them through our insulation and membranes service. For typical depths, the screed thickness guide is a useful check.

Heat-up and flooring on Frimley heated floors

The heating should stay off until the screed has cured. For calcium sulphate that is usually from about 7 days. A sand and cement floor needs 21 days or more. Tell us when your heating engineer plans to commission, so the pour date leaves the screed that time first.

When the heating goes on, it goes on gently. The commissioning plan comes from your heating engineer: the flow temperature creeps up a little at a time across several days, holds, and then eases back down. A sudden full blast can crack the screed.

Heat speeds drying, but it does not replace testing. Tiles, LVT and engineered wood all need the screed at or below their maker's moisture limit, and a calcium sulphate floor also needs its laitance sanded off before anything is laid. Our calcium sulphate screed page covers that stage.

Pipe laying stays with your heating engineer, and the screed follows once they are done, so get both trades talking about dates early. Underfloor heating screed in Farnborough, under two miles away, follows the same approach.

Underfloor Heating Screed prices in Frimley

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Frimley

Underfloor heating pipework running between two rooms before screeding
Underfloor heating pipework running between two rooms before screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Frimley

As the crow flies, our yard in Slough is about 15.6 miles from Frimley, which lies to the south-south-west. Postcodes here include GU16, and Camberley (1.7 miles), Farnborough (1.8 miles), Sandhurst (3.5 miles) and Yateley (3.8 miles) are close by.

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Frimley: your questions

Can I run underfloor heating into the old part of my Frimley kitchen?

You can, as long as the existing floor comes up first. Floors in houses of this age often have little or no insulation, so the slab is broken out or lowered, insulation boards and a membrane go down, then the pipes and screed, finishing level with the extension. Without that insulation, heat is lost downwards and the old part of the room stays cooler.

How soon can the underfloor heating be switched on after screeding?

Calcium sulphate can normally take heat after around a week; sand and cement has to wait 21 days or longer. Even then, your heating engineer brings the temperature up gently across several days as the commissioning plan sets out. In a Frimley extension being finished to a deadline, the calcium sulphate option can bring the heating, and the drying, forward.

Does screed over underfloor heating cost more?

Published 2026 figures put an underfloor heating liquid screed at £20 to £35 per m², and the job includes the care needed to encapsulate the pipes and protect them during the pour. What you pay overall comes down to the size of the floor, how deep it is and how easily we can get to it. For a Frimley extension, send drawings and room sizes for a fixed written price within 24 hours.