Choosing a screed for a Frimley extension or rebuild
Census 2021 recorded 5,931 households in the Frimley built-up area, many of them in detached houses from the 1950s to the 1990s. In homes like these, most floor work happens when the house is extended or opened up. The new floor has to meet the old slab at exactly the same level, and because floors from those decades often have little or no insulation, the extension is a good moment to add insulation boards and a membrane.
Which screed goes on top depends on the room. A pumped liquid screed for open-plan floors suits a large kitchen and family room, going down in a day with few joints. For a cloakroom, a shower room, a garage or anywhere that needs a cement base, a traditional sand and cement floor laid by hand makes more sense.
If the whole open-plan room is to be heated, the screed over the pipes needs the right cover and a gradual heat-up, covered on our underfloor heating screed page.
Old tiles lifted during a refit sometimes reveal cracked or hollow screed underneath. That is repaired first, and floor levelling with compound is often all the rest of the floor needs once any loose areas are fixed.
For offices at Frimley Business Park and off Lyon Way, refits usually need preparation and levelling over the existing slab before raised floors or carpet tiles; our floor preparation service covers the first step.
Homes in Frimley at a glance
Of the 5,931 households in Frimley, 41% live in detached houses and 32% in semi-detached houses. The largest group of homes here was built between 1945 and 1972 (47%), and a further 36% between 1973 and 1999.
| Homes in Frimley | Share |
|---|---|
| Detached houses | 41% |
| Semi-detached houses | 32% |
| Terraced houses | 13% |
| Flats | 13% |
| Built before 1919 | 4% |
| Built 1919 to 1944 | 3% |
| Built 1945 to 1972 | 47% |
| Built 1973 to 1999 | 36% |
| Built since 2000 | 9% |
House types from Census 2021 (table TS044); building age from the Valuation Office Agency council tax stock of properties, 31 March 2026 (table CTSOP 4.1). Figures cover the Frimley built-up area (E63005398).
Screeding services in Frimley
- Liquid ScreedOpen-plan kitchen extensions on Frimley's 1950s to 1990s houses suit pumped liquid screed: one pour, walkable in 24 to 48 hours.
- Sand and Cement ScreedLaying a new floor next to a 1970s Frimley slab, or screeding a garage or wet room? Hand-laid sand and cement at about 65mm.
- Underfloor Heating ScreedHeating the whole open-plan room in a Frimley extension? We screed over wet underfloor heating with full pipe cover and heat-up advice.
- Anhydrite & Flow ScreedNew build plots and apartment floors in Frimley: anhydrite flow screed to CA-C20-F4, CA-C25-F5 or CA-C30-F6, sanded and tested.
- Floor LevellingRefitting offices at Frimley Business Park or off Lyon Way? Floor levelling on the primed slab gives raised floors and carpet tiles a flat base.
- Latex ScreedLifting old tiles in a 1970s or 1980s Frimley kitchen? Latex screed over sound tiles, ply or concrete gives vinyl and LVT a smooth base.
- Concrete Floor GrindingA Frimley Business Park or Lyon Way office refit starts with a clean slab: diamond grinding by our own team, with dust extraction.
We also offer fibre reinforced screed, quick drying screed, high strength screed, bonded screed, floor preparation, screed repairs, concrete floor repair, screed pumping, insulation & membranes, commercial screeding and residential screeding in Frimley.
Access and timing across Frimley and Frimley Green
Before the day, think about where the mixer or pump will stand. A drive keeps it off the road; without one, it may need to stand on the street, so tell us about parking, shared access or restrictions when you ask for a price. The hose or barrow route then runs through a side gate or the front door, and it needs to be clear and protected.
Getting the date right counts for more than the pour itself. We come in when the extension is closed against the weather, the insulation boards and damp membrane are down, and any heating pipes are fixed and have passed a pressure test. Plastering first keeps water and debris off the new floor. On a knock-through, the old floor next to the new area should be exposed so we can set the level from it.
Afterwards, plan for drying. A pumped floor will take your weight after 24 to 48 hours, yet it cannot be covered until a moisture test says so, and drying runs at around one day for each millimetre of the first 40mm, longer beyond that. Book the kitchen fitters and flooring contractors with that in mind.
Postcodes here include GU16, and the same planning applies whether the house is in Frimley itself, Deepcut or Heatherside.
Screeding prices for Frimley floors
Sand and cement £18 to £25 per m², liquid £24 to £31 per m², supplied and laid (MyJobQuote, August 2026). MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide.
Who lays your floor screed in Frimley

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.
See what customers say in our Google reviews and on our testimonials page.
Reaching Frimley
As the crow flies, our yard in Slough is about 15.6 miles from Frimley, which lies to the south-south-west. Postcodes here include GU16, and Camberley (1.7 miles), Farnborough (1.8 miles), Sandhurst (3.5 miles) and Yateley (3.8 miles) are close by. Neighbourhoods we cover in Frimley include Frimley Green.
See our screeding services for every screed type we lay.