info@kandbscreeding.co.uk

Sand and Cement Screed · Hampshire

Sand and Cement Screed in Lymington

Our sand and cement screed for Lymington is batched outside your door, spread with a trowel and beaten down hard and flat. The old town is where it earns its place. Georgian and Victorian properties by the quay can have ground floors laid with no damp proof membrane, and renovating one often means digging out, insulating and screeding again. Their rooms are divided, with levels fixed by doorways and hearths, and that suits screed laid by hand.

Digging out old floors near Lymington quay

A floor with no damp proof membrane can behave for years under a rug before giving itself away: damp creeping along the skirting, flooring lifting, or a stale smell in a room left shut. Near Lymington's quay, Georgian and Victorian ground floors laid without a membrane are not rare, and putting new flooring over one simply seals the damp in.

Taking it out is what lasts. The old floor is broken up and carried away, and the ground lowered enough for the full build-up: damp proof membrane, rigid insulation, separating layer and edge strip, then screed. Laid over insulation, the sand and cement floats, so in a house it wants about 65mm of thickness to carry loads without cracking.

Houses of this age suit work done by hand. Walls and chimney breasts split the rooms, doorways and hearths fix where the floor must finish, and often one room is done while the family lives in the others. Sand and cement can be mixed a batch at a time and brought to the exact level in each.

Pouring a liquid screed over the new insulation is also possible, and some owners pick it for a bigger room. For the numbers behind each option, open our screed thickness guide. If the ground itself needs work before anything goes back, our preparation of floor bases deals with it.

Wet rooms, garages and terraces across Lymington

Water is where sand and cement beats calcium sulphate, which cannot take it. That makes it the screed to use under a level-access shower or a fully tiled wet room, whose floor must tilt gently down to the gully. We build that slope into the screed, giving the tiler a true fall to follow and not one made up in adhesive.

Garages are the other use. A garage becoming a study or bedroom needs its floor lifted to match the house, building up from a membrane through insulation to a flat screed on top; screeding a garage for conversion shows each layer.

In Lymington 18% of homes are terraced, and getting from the street to the back room of a terrace can mean a long, narrow route. Sand and cement is mixed on site in batches, so no pump has to be parked out front.

What you give up is time. A floating hand-laid floor at around 65mm stays damp far longer than a thinner pumped one. Short on weeks? A fast drying screed mix claws some back. Going by published 2026 rates, sand and cement costs £18 to £25 a square metre and quick drying mixes £20 to £28. The pumped option is on our Lymington liquid screed page.

Sand and Cement Screed prices in Lymington

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Lymington

Large finished ground floor screed with garden doors
Large finished ground floor screed with garden doors.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Lymington

Lymington is about 66.2 miles south-west of our Slough base as the crow flies, with postcodes including SO41. The nearest towns to it are New Milton (5 miles), Christchurch (10.6 miles), Totton (11.3 miles) and Southampton (11.8 miles).

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Lymington: your questions

Do old Lymington houses always need the floor dug out?

No. A solid floor that is sound, level and dry might just need levelling before new flooring. Digging out is worthwhile when there is no damp proof membrane and damp is getting through, when the floor is breaking up, or when you want insulation. We inspect the floor and tell you what it needs before giving a price.

How long before I can put flooring on a new sand and cement screed?

The rough rule is one day a millimetre while you are within 40mm, and slower below that, which puts a 65mm floating floor in a Lymington renovation into months and not weeks. Some floor finishes accept a bit more moisture than others, yet whatever you choose, a hygrometer reading and not the calendar says when it can go down. Choosing a faster drying blend at the start shortens all of that.

Is a wet room floor better in sand and cement or liquid screed?

Go for cement: either the hand-laid kind or a pumped screed bound with cement. Calcium sulphate is ruled out anywhere a floor might get wet. With sand and cement we can also shape the fall to the drain inside the screed itself. A Lymington ground floor poured in anhydrite elsewhere can still have its wet room laid in cement.

Free, no-obligation quote

A fixed price for your Lymington floor