In Redbridge we lay traditional sand and cement screed wherever a floor needs hand work: failed ground floors being dug out, wet rooms laid to falls, small rooms and garages. Age is the big factor in this borough, with 27% of Redbridge homes dating from before 1919. Floors that old, and the inter-war ones that followed, are often replaced during a refit, and a hand laid screed lets the new floor meet the old levels exactly.

Rebuilding older Redbridge ground floors by hand

When an older ground floor is opened up anywhere in Redbridge, what lies beneath can be a thin slab or rubble base with poor or missing damp protection. The practical fix is to dig down, lay a membrane and insulation, and screed over them to finish at the right height.

In a house the floating layer goes down 65mm deep, and in a commercial building 75mm. It is mixed on site to suit the job, laid between screed rails and compacted by hand before being trowelled to a dense, flat finish. Hand laying is what makes it right for older houses: it goes round chimney breasts, through narrow doors and into bay windows, and the finished level can be matched to the hall and any existing floor to within a few millimetres. Doorways are where that precision pays off, because a step of even a few millimetres catches feet and shows under thin flooring.

If the slab underneath is solid and the room has hardly any height to give, we can skip the floating build up and lay a screed bonded straight onto the concrete, 25 to 40mm thick.

The catch on a Redbridge refit is the wait before flooring. Each of the first 40 millimetres takes roughly a day to dry and the rest go slower still, which can leave a 65mm floor drying for weeks. Our article on how long screed takes to dry helps you time the flooring.

Small rooms, wet rooms and garages in Redbridge terraces

Terraced houses make up 32% of Redbridge homes, and in a terrace the rooms are often small and the access tight. Carrying mix through the house for a hallway or a back bathroom is usually quicker than setting up a pump in the road outside and running a hose through every room.

Wet rooms and walk in showers need sand and cement too. Calcium sulphate must be kept away from water, so a cement screed is laid with falls to the drain, set with rails and checked as the floor is compacted. Waterproofing and tiling are then laid to that same slope. Getting the fall right in the screed is far easier than trying to build it up later in tile adhesive, and it keeps water moving to the drain rather than pooling in a corner.

Garage conversions and outbuildings are a good fit as well. A garage floor is normally lower than the rooms next to it, so we bring it up to match with insulation, a membrane and screed; the guide to garage conversion floors shows the layers. Where cracking is a concern, a fibre reinforced mix adds £1 to £3 per m².

Sand and Cement Screed prices in Redbridge

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Redbridge

Wide bright room with a newly finished floor screed
Wide bright room with a newly finished floor screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Redbridge

As the crow flies, our yard in Slough is about 30.9 miles from Redbridge, which lies to the east. Postcodes here include IG2, E11, IG6 and IG5, and Chigwell (2.4 miles), Waltham Forest (3.2 miles), Barking and Dagenham (3.5 miles) and Newham (4.1 miles) are close by.

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Redbridge: your questions

How thick should sand and cement screed be?

On top of insulation, the floating layer is 65mm in a Redbridge house and 75mm under a shop or office. If heating pipes run through it, leave roughly 45mm above them. Bonded straight onto a solid slab, it can be as thin as 25mm and up to 40mm. In an older Redbridge house, the depth usually follows from the level the floor must meet.

Can sand and cement screed go in a Redbridge wet room?

Yes; in fact it is what we would choose for a wet room. We can lay it with a slope running down to the drain, and unlike a calcium sulphate floor it is not harmed by water. The screed is laid first, then the waterproof tanking and tiles go on top once it has dried enough.

How long before I can tile over sand and cement screed?

Reckon on a day for every millimetre up to 40mm and more for each one after, so a 65mm floor in a Redbridge extension may want more than two months, and longer still through a cold spell. Some tile adhesives and membranes allow earlier fixing, and quick drying mixes shorten the wait. A moisture test is the reliable check before tiling.