Timber floors are the awkward base in floor levelling. Concrete stays put; boards and joists flex underfoot and swell and shrink with the seasons. That movement decides which products will last and which will crack within weeks.
Short answer: yes, you can level a wooden floor with compound, but not by pouring it onto bare floorboards. Fix the boards down, overboard with screw fixed flooring grade plywood, then apply a flexible or latex compound that the maker approves for plywood, typically 2mm to 10mm thick. Sand and cement screed and standard compounds made for concrete are too rigid for timber.
The figures below come from manufacturers' data sheets (ARDEX, F. Ball and Karndean) and from Approved Document C. Where the data sheet for the product on your floor says something different, follow the data sheet.
Your options for levelling a wooden floor
| Option | Typical thickness | Works over | Main limit |
|---|---|---|---|
| Standard compound for concrete | 2mm to 20mm (F. Ball Stopgap 300) | Concrete, screed, tiles | Timber and plywood are not on its list of bases |
| Latex compound on rigid plywood | Up to 6mm on plywood (ARDEX ARDITEX NA) | Rigidly fixed flooring grade plywood | Boards must not move |
| Fibre modified flexible compound | 2mm to 10mm (F. Ball Stopgap 700) | Plywood at least 6mm, screw fixed | Plywood must not be nailed or stapled |
| Pre-level the boards, then plywood | Compound under at least 6mm plywood (ARDEX method) | Rigid but uneven or worn boards | Needs good subfloor ventilation |
| Sand or plane, then plywood and patch | Ply joints and fixings skimmed | Undulating timber floors (Karndean) | More labour, little height added |
| Full depth screed | 35mm upwards (our figures) | A structure designed for the load | Rarely suitable on existing joists |
Swipe the table sideways to see every column.
The pattern is clear. Every route that lasts puts a rigid sheet of plywood between the old boards and the compound, or uses a compound made to tolerate slight flexing.
Why timber moves and what that does to a rigid screed
Floorboards move in two ways. They deflect under load, because joists and boards bend slightly every time someone walks across the room. They also change size with moisture: timber takes up and gives off moisture with the air around it, so boards swell in damp months and shrink when the heating is on. The gaps between boards open and close as a result.
A sand and cement screed or a standard compound made for concrete sets hard and has very little give. Laid over moving boards, it cracks along the board joints first, then loses its bond and starts to break up under the new floor. Thin vinyl and LVT show every one of those cracks.
That is why manufacturers are so specific about timber. ARDEX's data sheet for ARDITEX NA says loose boards must be screwed down and firmly fixed before any levelling, and that in all cases subfloor ventilation must be adequate "to prevent deterioration and moisture movement". F. Ball describes Stopgap 700 as a compound for substrates that "flex or expand and contract slightly due to normal foot traffic and temperature changes", with fibres added so it keeps its strength under that stress.
Check the void under a ground floor
On a suspended timber ground floor, the space underneath matters as much as the surface. Approved Document C describes a ventilated air space at least 150mm deep under the timber, with vents in two opposing external walls of at least 1,500mm² per metre run of wall or 500mm² per m² of floor area, whichever is greater. Blocked airbricks lead to damp joists and boards, and no compound will hide that for long. Clear the vents before you level.
Flexible and latex compounds: depths and primers
Once the floor is rigid, the choice is between a latex compound and a fibre modified flexible compound. People searching for "flexible screed" usually mean one of these. Neither is a screed in the structural sense; both are thin smoothing layers.
| Product (manufacturer data) | Thickness over timber | Plywood needs | Walk on | Floor coverings |
|---|---|---|---|---|
| ARDEX ARDITEX NA, two part latex | Up to 6mm on plywood; 6mm to 8mm for light commercial | Flooring grade, rigidly fixed, conditioned to the room | About 2 hours | Most coverings after 4 hours at 3mm in good conditions |
| F. Ball Stopgap 700, fibre modified | 2mm to 10mm | At least 6mm thick, screw fixed to BS 5325 and BS 8203, not nailed or stapled | From 60 minutes | From 3 hours at 3mm on absorbent plywood |
Swipe the table sideways to see every column.
Primers depend on the product, so check which screed primer suits each base. ARDEX says ARDITEX NA can go onto flooring grade plywood without priming. F. Ball says absorbent subfloors must be primed with diluted Stopgap P131 so the compound does not dry too fast. Both manufacturers' times assume normal room conditions; cold rooms and thicker layers take longer, and F. Ball notes that above 5mm the time to floor coverings increases.
Two practical points apply to both. The plywood must be clean and free of anything that stops adhesion, and the compound should be spiked or rolled to release trapped air before it sets. Our latex screed page explains how we mix and lay two part compounds, and the latex vs self levelling vs screed guide compares them with water mix products.
Overboarding with ply first: when it is needed
For most wooden floors, plywood is the step that makes levelling possible. Karndean's glue down installation guide sets the standard for its own vinyl flooring:
- Floorboards and tongue and groove: secure loose boards, replace worn or broken ones, then lay a minimum of 5.5mm flooring grade plywood fixed to the manufacturer's instructions and national standards. Smooth the plywood joints with a patching compound or a primer and levelling compound.
- Chipboard, MDF and OSB: overlay with 5.5mm flooring grade plywood in the same way.
- Undulating timber floors: sand or plane to remove the undulations first, then overlay with 5.5mm plywood and fill the seams and fixings.
Karndean also says the plywood should conform to BS 8203 Annex A. F. Ball's minimum for Stopgap 700 is 6mm, screw fixed. In practice, the thicker the plywood and the closer the screws, the stiffer the floor.
When to level under the plywood instead
Some floors are rigid but badly worn, cupped or uneven from board to board. Plywood laid straight over them simply follows the humps. ARDEX's method for this case is to pre-level the timber with ARDITEX NA, let it dry, then screw fix at least 6mm flooring grade plywood on top for resilient flooring, or a tile backing board for ceramic or stone. The compound fills the hollows; the plywood provides the stable surface.
Steps for a typical timber floor
- Check the structure. Walk the floor, look for bounce, and lift a board if there is any sign of damp, rot or blocked ventilation.
- Fix the boards. Screw down loose boards and replace damaged ones.
- Deal with big humps. Sand or plane high spots, or pre-level with a suitable compound where the boards are rigid but uneven.
- Overboard. Screw fix flooring grade plywood, staggering the sheet joints.
- Prime if required. Follow the compound maker's instructions for plywood.
- Apply the compound. Pour and spread a flexible or latex compound to the depth needed, within the product's limits.
- Wait. Give it the drying time on the data sheet before the floor covering goes down.
Heavier preparation, such as removing old coverings and adhesive, comes under our floor preparation service.
Can you screed over floorboards at full depth?
People also ask whether they can screed over floorboards or plywood. In an ordinary refurbishment the answer is no. On our figures, a floating screed is about 35mm for domestic liquid screed and 65mm for sand and cement, as explained in our screed thickness guide. That is a large added load and a rigid slab sitting on a structure that flexes. Existing joists were not designed for it, and the screed would crack as the timber moves.
A full screed over timber only makes sense where the structure has been designed or checked for the extra load by a structural engineer, and where the screed system is specified for that use. If you are building up a timber floor by more than a compound allows, ask the engineer first.
Where only a few millimetres are needed, the plywood and compound route is lighter and quicker. F. Ball gives Stopgap 700's consumption as 1.40kg per m² for each millimetre, so a 5mm layer adds about 7kg per m². Our floor levelling page covers the levelling work itself, and screeding before flooring explains the moisture and flatness checks before any covering goes down.
When a wooden floor cannot be levelled this way
Some timber floors need repair before any levelling:
- Bounce you can feel. Undersized or damaged joists need a carpenter or an engineer, not a compound.
- Damp or rot. Find and fix the cause, which often means clearing airbricks or repairing the damp proof course.
- Large falls across the room. If one corner is far lower than another, the fix is usually in the joists, by packing or firring, rather than in a pour.
- Areas with frequent spillages. Karndean's guide says to use fibre cement sheets instead of plywood where frequent spillages are likely, primed before any smoothing compound goes on.
Get a fixed price for your floor
If you have a timber floor to level for vinyl, LVT, carpet or tiles, send us:
- photos of the boards and any obvious dips or humps;
- the room size in m², or the length and width;
- the new floor covering you plan to lay;
- whether it is a ground floor or an upper floor;
- your postcode.
We will tell you whether it needs latex, plywood and latex, or something else first, and give you a written, fixed price within 24 hours. Use the contact form or call 07466 650936 for a same day call back.
Sources
- ARDITEX NA technical data sheet, ARDEX UK, accessed 1 October 2026
- ARDITEX NA product page, ARDEX UK, accessed 1 October 2026
- Stopgap 700 technical data sheet, F. Ball and Co., accessed 1 October 2026
- Stopgap 700 product page, F. Ball and Co., accessed 1 October 2026
- Stopgap 300 heavy duty smoothing compound, F. Ball and Co., accessed 1 October 2026
- Karndean Designflooring installation guidelines, glue down (UK), Karndean Designflooring, November 2023, accessed 1 October 2026
- Approved Document C: site preparation and resistance to contaminants and moisture, HM Government, accessed 1 October 2026